Smart Switch | ZBMINIL2 in Cube

Cube version 2.8.1.

Smart Switch ZBMINIL2 firmware 1.0.14.

This probably just need translation improvement.

When I was trying to add schedule, the option for turn on / off are: open or close; which is not make any sense. After try it, open means on and close means off. This is very confusing. It make sense if the switch handle curtain / gate, but not make sense if switch handle light / device.

Screenshot above showing option available for Turn On / Off are Open and Close.

Schedules which were created from the option also state Open or Close.

Hope this can be improve to reduce confusion.